Learn
WellSchema and well engineering, explained clearly
Practical guides from the WellSchema team, on using the app and on the engineering behind a well schematic.
Using WellSchema
Create a well or import an EDM XML Export
A schematic belongs to a well, so a well comes first. Type its header yourself, or pre-fill it from an EDM XML Export read on your computer.
Read the guideAdd casing, tubing, packers and perforations
One section of the editor for each kind of component: add it, fill in its form, watch the drawing change, and save.
Read the guideAdd a tubing or casing size that isn’t in the list
The sizes on the Tubing and casing forms come from your Tubular Library. Add a missing one under Tubular and it appears on the form.
Read the guideAdd Formation Tops and bound a reservoir interval
There is no reservoir object. A formation runs from one Formation Top down to the next, so two of them can bound the interval you mean.
Read the guideImport a survey
Bring Survey Stations in from a spreadsheet, CSV, text file or PDF with a text layer, read in your browser, on every plan.
Read the guideUse AI reading: what leaves your computer and when
When your browser can read a file’s table, nothing is sent. For the rest: exactly what AI reading sends, when, and what is kept.
Read the guideExport and share a schematic
Export a PNG or a PDF, or turn on a read-only link anyone can open without signing in.
Read the guidePlans, Trial and Full Access
What each plan holds, what the Trial gives you, and what happens to your wells when Full Access ends.
Read the guideWell engineering
How to read a well schematic
Datum, casing strings, cement, and tubing hardware — in the order an engineer actually reads them. The beginner-friendly walkthrough.
Read the guideCasing vs. liner vs. tie-back, explained
Three ways to line the same hole, three different cost and integrity trade-offs — and how each one is drawn on the schematic.
Read the guideUWI formats: US vs. Canada
The 10/12/14-digit US API well number versus the 16-character Canadian UWI — format breakdowns and the data-entry pitfalls that corrupt well headers.
Read the guideWhat is TOC, and how is it shown on schematics?
Top of cement is where zonal isolation ends. What sets it, how it's verified, and how to read it off a schematic at a glance.
Read the guide